Peacock Engineers · Carlisle
Setting out, marked right the first time.
Your drawings, put on the ground. Grids, foundations, drainage, roads, rail and steel. If a mark is wrong, everything built on it is wrong, so we check before we leave.
Before you ring
What do I need to send you?
Your drawings, as CAD or PDF, and a postcode. Dimensioned CAD files mean we start marking sooner, because the maths is done before we arrive. If you only have PDFs, send them anyway.
How long does it take?
Most visits are booked by the day. Your quote gives you the day we arrive and what will be marked before we leave.
What does it cost?
A day of setting out has a starting price. from £ TBC, Kieron to confirm Worked out properly and put in writing before anything starts. See What it costs.
In your hands
Marks your trades can build from
Gridlines, levels and profiles for foundations, brickwork, drainage, roads, rail and steel. Positioned from your drawings with Leica robotic total stations.
Checked before we leave
Every mark is closed back onto the site control. You get the record, so there is no argument later about where the line was.
Site control that holds
We establish control stations the whole job can trust, and re-check them on return visits. Hourly or daily, full time or as and when you need us.

Proof
£60m West Coast Main Line renewal, Clifton
Setting out through round-the-clock possessions for Network Rail, near Penrith. Night work, live railway, no second chances.
